Wednesday, November 21, 2012

Building a Steam Locomotive

I'm going to start a long running blog on building a model steam locomotive, but don't worry if you're not interested in following this particular topic because it won't be a continuous blog.  I will be covering a lot of other topics along the way. 

This idea of building a model steam locomotive started over 10 years ago when I saw a set of plans for building a very detailed locomotive and coal tender.  Since my father had a great love for steam locomotives, I thought it would be a great project to build for a Christmas present for him.

 
 
I sent away for the plans and when they arrived, I immediately realized this was not going to be an overnight project, in fact it was quite overwhelming!  It involved hundreds, upon hundreds of parts that each would have to be fabricated from scratch.  OMG; what did I get myself into! 

I'm sure glad I got the plans in January and I had a chance to get started then.  Working nights and weekends, it took the entire year to complete.  Over 200 hours to complete.  I gave it to my Dad for Christmas in 2002.


 


I wish I had taken pictures while I was making it, but never thought about it back in 2002, but I will discuss a few of the details about the engine, coal tender, bridge and track as I go along. 

After my Dad died in 2003, my Mom decided I should have the train and was returned to me.  Since then I found the plans  (blue prints) for the passenger cars, coal hopper and caboose so decided it would be fun to build a complete train.  The engine and coal tender is about 3 ft. long now.  My future plans are to build two passenger cars, one coal hopper and the caboose, which will make the overall length of 11ft.

I've been working on the passenger cars, but will talk about those a little later.  On my next blog I would like to talk a little about some of the details involved with the engine.



Kitchen pictures in Pawleys Island



I know I should post some pictures as I actually write the blog, but I like to do things a little differently. Here are a few pictures of the kitchen I did in Pawleys Island,SC. It's a small ocean front condo that was built in the 70's.

 
 
 
 
This last picture is looking out the kitchen window.  I will have to admit it was hard to stay focused!  It's probably a good thing I did this job during the winter months.
 
 
 
 

Tuesday, November 20, 2012

California to South Carolina

Over the years I've designed, built and delivered furniture and cabinetry to a number of states; in fact 13 different states so far.  Most have been along the Eastern Seaboard, from New York to Florida.

I've had a web-site for a number of years now and it has slowly been getting more leads from all over. A lot of inquires are looking to see if we have a show room or do we produce a certain line of furniture, but every now and then I will get a request for a price on a custom piece.  Personally, I've found it hard to sell directly from the site since everything I do is custom and NOT CHEAP! 

So how do you sell a $5,000 to $10,000 piece of furniture or a $20,000 to $30,000 set of kitchen cabinets to someone on line when they've never met you or seen your work in person.  First, I try to keep a good variety of pictures of some of my work on my web-site.  Second, once someone e-mails me regarding a project or price, I make sure I respond immediately.  I try to give them some basic information and ask for more information from them.  I try to keep it simple and professional, but making sure to show a lot of interest in what they are inquiring about.

About 2 years ago I received an e-mail from a prospective customer in California asking about custom made kitchen cabinets for their Condo.  My first thought; how the hell do I deliver a complete set of kitchen cabinets to California?  But as I read on, I found out they own a Condo in Pawleys Island, South Carolina, which is not far from Myrtle Beach where my shop was.

They had been working with a design center in Myrtle Beach a couple years before that, but had to put the project on hold and when they decided to start again, the original design center was no longer in business.  They found my web-site, liked what they saw and decided to contact me to see if I would be interested in quoting a price on their kitchen. 

We e-mailed back a forth a number of times.  They sent a copy of the original design and a few pictures of the style cabinets, style doors and drawer fronts and also they would want them painted a custom color.

Something I've never done before, but decided to chance it on this proposal and that was to quote a rough price on the job without visiting the job site first.  I explained it was a very rough proposal, but wanted to see if this was in their budget before we proceeded further.  At the same time, I sent them a list of Customer References and asked them to take the time to contact each one to see what they thought of my work, was I on time, did I do what I said I was going to do, how I worked when in their home and how satisfied they were with the finished project?   I picked 6 different customers; each one I had done more then one project for over the years. ( I found out later, she had contacted all six and I'm glad she did).

I realized the wife was running the show ( her husband was a TV producer and left the project totally up to her).  She thought the pricing was fair and pleased that I sent the customer referral list at the very beginning.   I learned years ago that a customer really needs to feel comfortable with you if they are going to part with thousands of dollars to a stranger and in this case not being able to meet you in person.

We made arrangements for me to get keys to their condo in Pawlys Island and take a look at the job site, take all the measurements and see what was going to be involved.  She also hired a contractor to put in new sheet rock, new ceiling, new electrical and new flooring, so I had to coordinate with him on schedules and who was going to do what so we could get a final proposal back to her.

As always, I refuse to work "for" a contractor as a sub, so my proposal was totally separate from the contractor.  I never knew what he charged for his portion of the work and he never knew what I charged.  I like it that way.  I work strictly for the customer, not the contractor.

We did all the final design and finalized on the final quote, sending her drawings and prices thru e-mails.  I got a signed contract and deposit to start the job and never met the customer. Actually, the first time we finally met face to face was at my shop and her kitchen was better then half built.  She had flown in from California to finalize on some of the things for the condo. (flooring, granite, tile for back splash and lighting fixtures).

She really enjoyed stopping by the shop and actually getting to see her kitchen cabinets being built.  That's one thing I've always enjoyed; letting customers come by so they can see how everything is built.  I have nothing to hide and they really appreciate what goes into making a quality product.

The second time she saw her kitchen cabinets, I was doing the installation.  She flew in again to see the overall progress of the total project and pick out some final things for the kitchen.  She had to go home before it was totally installed, but she was thrilled with what she saw and told me to just send her the final bill when I was finished with my part and she would send me a check.

I finished my part about a week later, sent her a final bill along with a bunch of pictures.  She never hesitated to send me a check for the final payment and she never saw the kitchen again until almost six months later.  When they came to the East coast , she brought her husband by my shop so we could meet and he was able to see the shop.  They invited the contractor and myself to stop by so we could all celebrate and enjoy a Margareta. ( did I mention this was a beach front condo?)  Some jobs are just better then others!

I know I have some pictures of the project so I will post a few on my next post. The very last project I did before I retired and move to Delaware was doing a couple vanities for the same customer.  I never got to see them on that project, but sent lots of pictures and again they were thrilled!

Sunday, November 18, 2012

Pictures; kitchen before/after

Thought I would post a couple pictures of the Kitchen I've been talking about in my last couple post.
Like I said earlier, we didn't really change the foot print of the kitchen, just changed from white to cherry.  More of a modern look.  The cherry cabinets were finished with clear pre-catalyzed lacquer so they will darken over time to a beautiful patina. 

The pictures were taken before I was even finished with the install and it's amazing how much they have darkened since they were installed.  Within a couple months they already began to blend with the other cherry furniture in the condo.

The first couple pictures were taken on the first day of installation, as you can see it was left up to me to clear out the kitchen. Not only was everything was left on the counters, but the cabinets were full also.


I had just finished putting back the final touches when I took these pictures with the new cabinets. The only thing left to do was to install a new piece of granite behind the slide in cooktop since they changed from a free standing stove to a slide in.  We had a piece of matching granite cut that went behind the stove up to the microwave.  When installed, it looked like it had always been there.



Next time I'm going to talk about dealing with a customer from California when I'm in South Carolina!

Tuesday, November 13, 2012

Installing the Kitchen Cabinets

In my last post, I talked about the kitchen remodel I was doing and the unique installation I found myself involved in.  How do you remove old cabinets and install new cabinets without disturbing the existing granite counter top?

Designing and building the Cherry cabinets was a piece of cake, but now it was time for "out with the old and in with the new"!

I started by removing the upper cabinets. After getting all the cabinets unloaded (that's right, the customer left all that for me to do).  I then removed all the doors and shelves.  I very carefully cut the caulking along the top, bottom and sides where the cabinets meet the wall.  Remember, this was brand new wall paper and they did not want to disturb it or have to redo anything that was already done.  Taking my time I slowly and very carefully removed each cabinet.  So far, so good; all the old upper cabinets are removed and not one thing disturbed on the wall.  I cheated when I built the new upper cabinets by making them 1/4" longer  and 1/8" deeper then the original ones and it worked out perfectly.
 
When I installed the new cabinets, they lipped the wallpaper by just a whisker and looked like it was always that way.  All the upper cabinets went in very simple and that part of the installation was pretty much the same as any other cabinet install.  I will have to admit that I am very slow when it comes to installing, but I think that just has to do with being so particular about everything being level, plumb and aligned.

Now came the fun part; how and where do I start with the base cabinets?  All the old appliances have been removed and the sink, disposal and hot water dispenser was removed.  If you were wondering, yes, I brought a plumber in to remove the dishwasher, sink, disposal and hot water dispenser.  I've done all that before, but this was on the sixth floor of a bunch of $600,000 condos and if water was going to flow, it was going to be somebody else's responsibility. 

I removed all the doors, drawers and shelves in the base cabinets.  I knew I would basically have to destroy each cabinet to be able to get it out from under the counter.  I started with the end cabinet that was next to the refrigerator opening.  I very carefully cut all the silicone I could see along the front edge and along the side that was the end of the counter.  Thank goodness for particle board sides and staples because I was able to slowly knock the side of the cabinet loose from the face fame, bottom shelf and back without disturbing the counter at all.   Once I got it loose enough, I was able to tip it to the side and remove the one side of the cabinet.  I left the back stringer of the cabinet screwed to the studs while I carefully removed the toe kick, bottom self and face frame.  Each was broken up and removed piece by piece.  I made a brace to support the front edge of the counter and since the back and back stringer was still attached to the wall the counter was supported and never moved.

Now I went to the next cabinet and carefully repeated the same procedure.  When I had the second cabinet removed, again with the back of the cabinet still in place screwed to the studs and the front supported by a temporary support, I then took one of the new base cabinets and slid it back under the counter part way.    If you've been following closely, your first question should be, if I couldn't get the old cabinet out from under the counter because the cabinets where literally sitting in a hole, then how could I get the new cabinet back in.   I originally thought of just building the 4" base for the toe kick separately; install that "in the hole" and then slide the new cabinets in between the base and the counter top.  The only problem with that scenario is, I had no idea how the floor ran in conjunction with the counter top.  How would I be able to level and keep the cabinets tight to the bottom side of the counters?  So what I did was build the cases minus the 4" base.  I used heavy duty cabinet leveling legs so I could adjust the legs up enough to slide the cabinet in under the counter and then adjust the legs to bring the cabinet up tight to the underside of the counter. 

Here's where it got tricky; I could only push the cabinet back in so far since I still had the back of the old cabinet screwed to the wall and was in the way.  I had to leave enough room between the new cabinet and the remaining parts of the old cabinet to be able to get behind and remove the back.   This meant that the back of the new cabinet was sitting in the hole and the front of the cabinet was sitting on the new floor.  I adjusted the legs so it sat flush with the bottom of the underside of the counter and gave support.   I then crawled in behind the new cabinet and carefully removed the old back and stringer, leaving the one that was on the end of the counter next to the refrigerator opening still in place for the added support I needed.  I then loosened the tension on the new cabinet just enough to slide it little by little back into the opening until all four legs were where they should be and could raise the cabinet tight to the bottom of the counter.  I did not fasten the cabinet to the wall yet.

I now took the new cabinet that was for the end next to the refrigerator opening and slide that cabinet back part way and adjusted it to the counter like I did the first one.  Carefully removed the rest of the old cabinet, put in a temporary support at the very edge of the back corner and then slide the new cabinet back into the hole so I could adjust the legs again to make it tight to the underside of the counter.   So far, no signs whats so ever that the counter has been disturbed at all. The caulking has not even cracked along the wall or between the back splash and counter.

  Would you believe that took me a full day just to get that far?  Two cabinets!   I'm exhausted, but pleased with the results, so it was time to call it a day and start the whole process over the next day.

The next day was another challenge because now I was going into a dead corner and supporting the "L" shape of the counter while removing the old and getting the new in took a long time also.  Two more cabinets and undercounter refrigerator and that was it for another day.  The great part was I had a complete run of cabinets done along one wall, around the corner up to the range opening.  The cabinets looked great and the counter top remained perfect!  But now comes the real challenge; I have the other wall to do which includes the opening for the dishwasher, the sink cabinet (with all the plumbing coming thru the wall) another cabinet and then a lazy susan base cabinet in the opposite corner.   Almost 10ft of run with the sink cut out to deal with. 

Let's deal with that on my next post!  I'm exhausted just thinking about it.

Monday, November 12, 2012

Kitchen remodel with a twist

     After 27 years of woodworking I did something with a kitchen remodel that I never tried before; and most everyone said it couldn't or shouldn't be attempted.  Let me give you a little background on this job before I get into the actual remodel.

     I have a customer I've done many projects for over the years, including their main home, his office, their cabin in the mountains and their condo at the beach.  They purchased a new upscale condo in North Myrtle Beach, SC about 5 years earlier and they were never that impressed with the kitchen, so I was asked to quote a price on designing and building a new kitchen.   So far, so good!

     Existing kitchen cabinets were white melamine cases with MDF termofoil 1pc. raised panel doors (typical cabinets used by contractors for many price level homes).   The counter tops were Granite with a 4" high Granite back splash.  The overall footprint of the kitchen was going to remain the same as the original layout.  New cabinets were to be Euro style (cherry inside and out) with modern style doors and drawer fronts.

So..........where's the twist?  Let's count the twist.
First; they had installed a new tile floor earlier and did not want to disturb that.
Second; they had just wallpapered the walls in the kitchen and did not want to disturb that.
Third; the upper cabinets were mounted tight to a soffett with no moulding and did not want to have to use moulding when the new cabinets were installed.
Fourth; All new appliances, including range, microwave/hood,dishwasher, refrigerator, sink and they wanted to add a small under counter refrigerator.
Fifth; They had beautiful Granite Counter tops and wanted to keep those.

So.........what's the big deal?   Well to start off, the granite people said they could not pull the old Granite counter top off without breaking it. Their excuse was; the granite was siliconed down and since the area around the sink cut-out was only a couple inches wide, they were sure it would break at that location since the counter ran from wall to wall and it was approx. 10ft. long.  Now; my customer does not like to take "No" for an answer, so you can see where this is headed. 

Now my customer wanted to know if there was any way I could remove the old base cabinets and install new base cabinets without removing the granite counter tops and back splash?

I had to give this one a little thought.  Let's see, I have granite counter tops "siliconed" to the old cabinets, a new tile floor that was installed after the cabinets were.........which means the cabinets are sitting basically in a hole so even if I can somehow cut the silicone, I can not pry the counter tops up and I can't slide the cabinets forward because of the floor.  Anyone besides myself see a problem here?

All I'm going to say for now is, I took on the challenge.  I'll tell you how I handled it and how things turned out in my next blog.







Sunday, November 11, 2012

What was I thinking?

     Obviously I've been doing a lot more thinking then actually writing.  It's been a long time since I've posted on my blog, so I believe it's about time to get back at it and see if I can catch up on a few things that's been happening over the past two years.

     Let me make a quick list, then I'll try to fill in some of the details as I go along.

 2008:  "Best" year I ever had as far as business went. Designed, built, finished and delivered more furniture then any previous year.

2009:  "Worst" year I ever had as far as business went. Designed, built, finished and delivered less then 50% compared to 2008

2010:  Worked harder then ever to pull things back from the brink of nothing and ended with something in between 2008 and 2009.

2011:  Here we go again!  Back to even worst then 2009.  This is really taking all the fun out of woodworking.  I've got to make some decisions, so in July of 2011, I sent a letter to all my customers letting them know that I planned on retiring the Hufford Furniture Group in July of 2012.  One more year and that would be it.

I'll have to admit, it did generate some business for the remainder of 2011 and the start of 2012. 

In October of 2011, Tracy's great aunt passed away and Tracy had a chance to acquire her property in Delaware.  From September of 2011 to March of 2012, Tracy made 12 trips to Delaware to take care of the estate, etc.   From October of 2011 to March of 2012, I made 6 or 7 trips to Delaware to help take care of the property, etc. and still operated my business in Myrtle Beach, SC.  So in March of 2012, we made the decision that I would retire a couple months early and we would move to Delaware.

Well...........that's it in a nutshell!  I'll fill in the details as I try to catch up with life.  I had no idea being "retired" kept you so busy.